FAIL (the browser should render some flash content, not this).
FAIL (the browser should render some flash content, not this).
Project Showcase Below are some of our recent projects. References available upon request

LA soundstage South Region Sr. High School No. 2, Los Angeles, CAClient: Los Angeles Unified School District (LAUSD)
Construction estimated Cost: $174,189,918

Specifics: The proposed school will provide educational facilities for students and faculty, 2,025 seats and 75 classrooms, administrative offices, performing arts/multi-purpose/practice gymnasium, cafeteria and food services area, lunch shelter, library, playfields, gymnasium, and subterranean parking.

long beach aquarium South Region High School No. 12, Los Angeles, CAClient: Los Angeles Unified School District (LAUSD)
Construction estimated Cost: $183,239,980

Specifics: The proposed school will provide educational facilities for students and faculty, includes 75 classrooms, a multi-purpose room, performing arts room, a library, a media center, career center, food services, administration rooms, gymnasium, sports fields and courts, a swimming pool, a 1500 seat stadium and a 188 space underground parking structure.
continental grand plaza West Los Angeles College General Classroom Building, Culver City, CA

Client: Los Angeles Community College District (LACCD)
Construction estimated Cost: $ 49 million

Specifics: One of two new structures at WLAC. A 46,000 Sq foot classroom bldg will house the Child Development dept, language arts, and behavioral science department

continental grand plaza West Los Angeles College Student Services Building, Culver City, CA

Client: Los Angeles Community College District (LACCD)
Construction estimated Cost: $ 49 million

Specifics: One of two new structures at WLAC. A 42,000 square foot student Services building

continental grand plaza Pierce College Center for the Sciences, Woodland Hills, CA

Client: Los Angeles Community College District (LACCD)
Construction estimated Cost: $57,000,000

Specifics: Includes: A Physics and Planetary Science department; project is a two-story courtyard building will house the department of life sciences, chemistry, physics (including planetary science), nursing, and office space for staff and faculty.. The 9,000 sq. ft. secondary building will be a single-story structure to house the veterinary tech facilities.

continental grand plaza LA Mission College East Campus Complex, Sylmar, CA

Client: Los Angeles Community College District (LACCD)
Construction estimated Cost: $ 40-50 million (project split into two phases due to delayed DSA approval)

Specifics: consists of two instructional buildings one building will house a lecture auditorium and multi-purpose classrooms, 2nd building will be utilized for life and physical science laboratories. The Parking structure will be one of two major structures servicing this campus.

 

continental grand plaza LA Mission College Health and PE Center, Sylmar, CA

Client: Los Angeles Community College District (LACCD)
Construction estimated Cost: $ 45 million

Specifics: The facility's plans include five classrooms; three multi-purpose rooms; shower and locker facilities including one for staff; two gymnasiums; an elevated indoor jogging track; offices, storage rooms and other miscellaneous rooms, two elevators, therapy training rooms, fitness and weight room with all state of the art equipment.